What's New
- AuthorPosts
Hello, I have added characteristics for the products in a certain order and when saving the characteristics they have been out of order, how can I change the order of the characteristics?
On the other hand, it is possible to add centered headings (if it can be with icons as in advance custom content) to differentiate blocks of characteristics, ex: engine: all engine characteristics, engine type, power, maximum speed ….,
Battery: All Battery characteristics, Battery type, battery capacity, charging time ……..
Features with headings would change based on product category
ThanksAttachments:
Hi, I solved the feature order issue, and for the headers I have created a feature with a space in the uppercase value and placed it on top of the feature set that interests me. The problem is that being the same color goes unnoticed, could you change the size, color or underlining of those header features? Or that the row of the header characteristics be green, the text white and centered?, to highlight where a set of features begins, as I have said now goes unnoticed since everything is the same color.
If I customize a tab as if it were the product details tab, then can it be used in the comparer?
ThanksAttachments:
Hello, I have modified the code but one thing is missing, what I want is that a particular characteristic, for example, “COMMERCIAL DATA”, “ENGINE”, “BATTERY”, “CHASSIS”, “SUSPENSIONS”, “BRAKES”, ” WHEELS “,” MEASURES, WEIGHT AND CARGO “,” EXTRAS “, (which are the titles of the sets of characteristics) in Spanish” COMMERCIAL DATA “,” MOTOR “,” BATTERY “,” CHASIS “,” SUSPENSIONS “,” BRAKES “,” WHEELS “,” MEASURES, WEIGHT AND LOAD “,” EXTRAS “, set like this now (green background, white text) and the rest of the categories with normal text (Blue which is already by default) and aligned to the left. How can I select a specific category by name?
Attachments:
Hi,
Please try adding the following code to the “Custom javascript code” under Theme editor > Custom codes:jQuery(function($){ var val = $('.product-features .data-sheet').find('.value').text(); if (!$.trim(val)) { $(this).css({'background':'blue','color':'white','text-align':'center'}); } });
Best regards.
Hello I already copied it but it does not work, I have tried to delete the first code you gave me and it still does not work, I remind you that the characteristics that are in uppercase have to be with a green background and white and centered font, and the rest of the characteristics in lowercase with a blue font that is already by default and on the left, these changes must also be present in the comparer
ThanksHi,
I changed the code to resolve the problem.
Please try to replace the /modules/stlovedproducts folder with my attached one.
Best regards.Hello I uploaded the love zip folder by FTP and it still does not work, I am surprised that the message to replace files did not come out, it seems that there was no love folder with the same name in the modules.
The circle with the number of products chosen is not shown in the comparator icon of the sidebar mobile.
As for the headers of the characteristics The headings in blue that you have created is what I wanted but in this green color # 339933 ando fon white, and the characteristics that are in the image with a centered green background and white fonts, must be the same as the value of the characteristics, Blue font and to the left.
I have removed the code that puts the characteristics with a green background in white font centered (CSS CUstom) so that it reverts to their default state and the headers with a blue background that you have created do not work. I have pasted the code again and it still does not work.The capture code, which is the one that I have deleted affects the custom javascript code? On the other hand, if I add more headings in capital letters in other products, will they be the same as you left it?
I have rotated the custom css code, in case it affects the custom javascript code. if it does not affect delete it, the appearance remains the same without the custom css code
ThanksAttachments:
Ok de button loves work, the problem is that I have configured that People do not have to login to love products so that the love button works and it does not work, if you register in the wish list it works.
1º The wish list button inside the products opens the side panel on the right where I have the whatsapp button and it gives a problem when deploying it, you have to change it to the left. On the other hand, it asks to register to use the Wishlist block, is there any way to use it without registration?
2º look at the capture for the headers, it is a montage of images.
The categories in uppercase would be the headings of the sets of common characteristics for that heading, for example,
COMMERCIAL DATA:
brand, model,
version,
year.
MOTOR:
Electric motor type,
Power (KW),
Power (CV),
Traction Type,
………
By the way I have seen that under the headings there is like a dotted line, if it can be a smooth edge better. And if I upload a product with other different characteristics, that the characteristics that are in capital letters become a green background and a white font, if it can be when products are added to the comparer that these changes are also shown.
Thanks for your time
ThanksAttachments:
1º The wish list button within the products opens the side panel on the right where I have the whatsapp button and gives a problem when displaying it, how can I change it so that the side panel is displayed from the left.
2º The button loves work, but you have to register on the wish list for it to work, the problem is that I have configured that People do not have to login to love products so that the love button works and it does not work, if you register in the wish list it works. Capture 1º
3º The js code when you put it if it worked, but now it does not work, I do not know why, if possible it would be good to increase the margin a little between the characteristics and the values
ThanksAttachments:
Hi,
1. I checked the wishlist, that was fine, see the enclosed screenshot.
2. I tried to click the loved button without logging in, that was also fine.
3. I changed the code on your backoffice, it seems you used the old one to override it, I added the following code:jQuery(function($){ $('.product-features .data-sheet').each(function(){ if (!$.trim($(this).find('.value').text())){ $(this).css({'background':'#339933','color':'#ffffff','text-align':'center'}); } }); });
Please add the following code to the Custom CSS code to change the margin:
.product-features dl.data-sheet dt.name { min-width: 300px; }
Best regards.
Attachments:
Hello, as for the wish list, when displaying it, the whatsapp button is also shown, for that reason change to the right the entire left side panel, Cart, search bar, love button … Please toggle left wishlist side panel to show left to right, can’t find option to do it.
As for the headings it looks good, could you remove the dots that are seen at the bottom of the green background? and change the color of the borders or lines that separate each feature, keeping the color of the border that surrounds the tabs ?. Could this change be included in the comparator? screenshots attached.Thank you
Attachments:
The theme of the header is fine but I have found a problem, when choosing another model in the combination, in this case type of engine, the header disappears, can this design change be made in the comparator, and that the data in the comparator are left aligned? right now they are aligned with the center.
As always thank you very much you are incredible“https://electric-urban.com/ecoxtrem/ecoxtrem-rocket”
By the way I am having problems in the forum, I get a lock screen / Access Denied – Sucuri Website Firewall / An attempted RFI / LFI was detected and blocked. This happens when uploading a screenshot or a link, until now it had not happened to me
https://electric-urban.com/ecoxtrem/ecoxtrem-rocket- AuthorPosts
You must be logged in to reply to this topic.